13/05/2015 09:00
ENGIE - Unavailability of Doel 3 and Tihange 2 - Press Release May 13 2015
Télécharger le fichier original

INFORMATION REGLEMENTEE

Press release
May 13, 2015

The Group adjusts its range for 2015 net recurring income Group share,
following the review of the period of unavailability of Doel 3 and Tihange 2
Electrabel, GDF SUEZ’s subsidiary, announced today that the period of unavailability of Doel 3 and Tihange 2
st
Belgian nuclear plants is reviewed to November 1 , 2015 in accordance with its transparency obligations. This
update follows the details communicated by the Federal Agency for Nuclear Control in the context of the review
process about the reactor vessels of Doel 3 and Tihange 2.

The impact from the outage of these two plants on the net recurring income Group share is estimated at
approximately EUR 40 million per month.
1
The Group adjusts accordingly its range for 2015 net recurring income Group share by EUR 0.15 billion,
2
corresponding to four additional months of outage, with a range between EUR 2.85 and 3.15 billion , assuming
3
average weather conditions in France. This target is based on estimated EBITDA and current operating income
respectively between EUR 11.55 and 12.15 billion and EUR 6.65 and 7.25 billion.

In addition, the Group confirms:

• a net debt/EBITDA ratio less than or equal to 2.5x and an “A” category rating;
4
• a 2015 dividend with a 65-75% pay-out , with a minimum of 1 euro per share, payable in cash. The Board of
Directors has decided upon the principle of an interim dividend of EUR 0.50 per share for financial year 2015
that will be paid on October 15, 2015.

Appendix : Electrabel press release dated May 13, 2015

About ENGIE
ENGIE develops its businesses (power, natural gas, energy services) around a model based on responsible growth to take up today’s major
energy and environmental challenges: meeting energy needs, ensuring the security of supply, combating climate change and optimizing the
use of resources. The Group provides highly efficient and innovative solutions to individuals, cities and businesses by relying on diversified
gas-supply sources, flexible and low-emission power generation as well as unique expertise in four key sectors: independent power
production, liquefied natural gas, renewable energy and energy efficiency services. GDF SUEZ employs 152,900 people worldwide and
achieved revenues of EUR 74.7 billion in 2014. The Group is listed on the Paris, Brussels and Luxembourg stock exchanges and is
represented in the main international indices: CAC 40, BEL 20, DJ Euro Stoxx 50, Euronext 100, FTSE Eurotop 100, MSCI Europe, ASPI
Eurozone, Euronext Vigeo Eurozone 120, Vigeo World 120, Vigeo Europe 120 and Vigeo France 20.




Press contacts: Investor relations contact:
Tel. France: +33 (0)1 44 22 24 35 Tel.: +33 (0) 1 4422 6629
Tel. Belgium: +32 (0)2 510 22 76 70 Email: ir@engie.com
Email: engiepress@engie.com


ENGIEgroup

1
Net income excluding restructuring costs, MtM, impairments, disposals, other non-recurring items and associated tax impacts and nuclear
contribution in Belgium. This target assumes average weather conditions in France, full pass through of supply costs in French regulated
gas tariffs, restart of Doel 3 and Tihange 2 as of November 1st, 2015, no significant regulatory and macro-economic changes, commodity
price assumptions based on market conditions as of December 31st, 2014 for the non-hedged part of the production, and average foreign
exchange rates as follows for 2015 : €/$ : 1.22, €/BRL : 3.23.
2
The initial range based on a restart on July 1st 2015 was between EUR 3.0 and 3.3 billion
3
Including share in net income of associates
4
Based on net recurring income, Group share


engie.com
GDF SUEZ CORPORATE HEADQUARTERS
Tour T1 – 1 place Samuel de Champlain – Faubourg de l’Arche - 92930 Paris La Défense cedex - France
Tel + 33(0)1 44 22 00 00
GDF SUEZ SA WITH CAPITAL OF €2,435,285,011 – RCS NANTERRE 542 107 651
www.gdfsuez.com